Product Description
Built with efficiency and hotter climates in mind, the BITMAIN ANTSPACE HK3 (known as model designation Antbox H3 V2 internally) has a maximum capacity of 210 units of Antminer S19 Pro+ Hydro with total consumption of a little over 1MW. The minimum ASIC quantity to compliment the order will be 195 S19 Hydro units per container. The AntSpace HK3 is sold as a two-piece stackable set– a cooling tower and mining container. Refer to the brochure in the downloads tab for technical details. Unlike Bitmain, we provide DDP (delivery duty paid) service for the ASIC miners, but not the container. THE UNIT IS NOW FREE WHEN PURCHASING MOQ OF 195 S19 HYDRO. Price for AntSpace does not include door-to-door ocean freight service. Freight costs will be quoted at time of loading as shipping costs vary weekly, and by location. ExWorks / FOB incoterms available. 1 year manufacturer warranty included. S19 Pro+ Hydro warranty void if used outside the AntSpace HK3 system.Product Video
Product Parament
Model | ANTSPACE HK3 |
Dimensions (L*W*H) (mm) | 6058*2438*2896 |
Miner Capacity | 210 units -S19 Hyd. Series miner |
Container Certification | China Classification Society Certification |
Safety Certification | North America/Standards:NFPA 79:2021,UL 508A:2018 R8.21, CSA C22.2 No. 14-18,ANSI/ISO 12100:2012 EU/Standards:EN ISO 12100,EN 60204-1 |
Operating Power(kW) | 1047~1050 |
PUE(Power Usage Effectiveness) | 1.022(Excluding cooling tower)/1.036(Including cooling tower) |
Input Voltage and Frequency | 415V±5% 60Hz(North America) 400V±5% 50Hz(EU、Middle East) |
Shipping Weight(T) | 8 |
Operating Weight (T) | 12 |
Main Switch of Power Distribution Cabinets(A) | 1200(North America) 1250(EU、Middle East) |
Rated Current(A) | 952 |
Standard Power(kW) | 1049 |
Maximum Power(kW) | 1050 |
Rated Current per Miner(A) | 10 |
Connection Interface(Cooling Tower) | DN125(GB/T 9119-2010 PN16 DN125) |
Connection Interface(Plate Heat Exchage Interface) | DN100(GB/T 9119-2010 PN16 DN100) |
Flow Rate(m³/h) | >85 |
Quantity of ANTSPACE powered by one 2500kVA Transformer | 2 |
Environmental Requirements
1 | Cooling tower is required to be placed on flat ground, horizontal degree (±1 degree). |
2 | The ground surfaced is required to be hardened and stable, able to withstand at least 14-ton load |
3 | A 10-ton crane is needed for unloading ANTSPACE and cooling tower. |
4 | Add-on items such as stairs, transformers, cables, bridge racks and cable distribution boxes are not included in the delivery of ANTSPACE. BITMAIN team can provide design suggestions if needed. |
5 | Client needs to confirm the opening directon of container and it needs to face air-intake. Door on left is current design by defult. |
6 | Keep at least 2 meters of air in-take space around the cooling tower. |
7 | Altitude: ≤3000m. If the altitude is higher than 1000-meter, transformer and switch should be derated, the total power of ANTSPACE must be decreased by 1% for each elevation increment of 100 meters. |
8 | Operating temperature: -25°C to 40°C. Operating humidity: 10%RH to 90%RH. When the initial coolant temperature is below 20 °C, the internal circulation should be turned on to heat up the coolant to above 20 °C before starting the mining machine. |
9 | When the ambient temperature is below 5 ℃, the cooling tower can be switched to cold-dry mode. |
10 | Choose pure water or suitable antifreeze as coolant based on local climate conditions. |
11 | The suitable ambient temperature for ANTSPACE does not represent the suitable ambient temperature for mining machine. |